|
Romanian Air Force Mission Romanian Air Force Structure Leadership Doctrine |
|
Search in site |
|
![]() |
||
Avionul IAR-99 Şoim |
|||
| IAR-99 ŞOIM aircraft has an integrated avionics system with an computer-assisted architecture (a MMRC computer similar to MIG-21 Lancer's), modern communications including frequency-stepping radios software-controlled, an integrated weapon system, gun, lase-guided bombs, air-to-air missiles R-60 MK, r-13 M, Python-3 connected to a DASH system. It is also provided with an up-to-date inertial navigation system, GPS-INS and low-visibility landing control systems (VOR, ILS, DME). Flying and navigation data are displayed on HUD (Head-up Display), on the helmet DASH and MFDC color displays. One of the best elements of the aircraft avionics is virtual training system which allows, based on Data Link system, in-flight simulations of firing and air combat capabilities using two or more aircraft. The program started based on: - Minister of Defense's approval of the Report no.SA2/497/1996 concerning IAR-99 aircraft modernization; - Romania's High Defense Council's approval of the Report no. SA2/201/1999 concerning IAR-99 aircraft modernization; - Agreement no.02/109/2004 concluded by Elbit Systems Ltd. and C.N. Romtehnica SA on purchasing the IInd Pool of IAR-99 SOIM aircraft.
Contracts Based on Agreement no. 02/056/2000 from 14.12.2000 between R.A. ROMTEHNICA and ELBIT SYSTEMS Ltd. the first four serial aircraft are finalized. Based on Agreement no.02/109/2004 from 20.10.2004 between R.A. ROMTEHNICA and ELBIT SYSTEMS Ltd. program completion is provided by purchasing 8 IAR-99 SOIM aircraft (3 newly made and 5 upgraded) as well as a logistic package and a flight simulator for this type of aircraft. Delivery First pool: Serial production started on 05.09.2001 and finished in 2003 when aircraft no.719, 720, 721 and 722 were delivered. Second pool: Serial production (8 aircraft: 723, 711, 712, 724, 717,
709m 725 and 713) started in December 2004 and it is to be finalized
in August 2008. The first aircraft will be delivered in May 2006, and
the others within a 4 month interval up to August 2008. |
|||
| Links | Site map | Download | AF Magazine | Museum | Contact |
Copyright
© 2010 - Romanian Air Force. All rights reserved. |
|